R
RajjeViyu
Sign Up

RajjeViyu Assistant

Ask anything about Maldives news

News infrastructure / study Addu City Impact 7.0/10 3 min read
Technical Study for Addu Bridge To Be Assigned Soon: Minister Muththalib

Technical Study for Addu Bridge To Be Assigned Soon: Minister Muththalib

Minister of Construction and Infrastructure Abdulla Muththalib announced that a contractor will soon be assigned for a technical feasibility study and design of the Addu Bridge, which will connect the interlinked island districts of Addu City and Hulhumeedhoo. The project is part of President Mohamed Muizzu's 'Week 14' roadmap with MVR 30 million budgeted for 2024. The bridge will have two landing points, one near Shangri-La resort. The feasibility study will involve Atoll Councils and the public to minimize impact on reclaimed areas. President Muizzu stated that the contract will ascertain the bridge's cost. The bridge aims to connect all Addu City districts, fulfilling a campaign pledge.

Minister of Construction and Infrastructure Abdulla Muththalib announced that a contractor will soon be assigned for a technical feasibility study and design of the Addu Bridge, which will connect the interlinked island districts of Addu City and Hulhumeedhoo. The project is part of President Mohamed Muizzu's 'Week 14' roadmap with MVR 30 million budgeted for 2024. The bridge will have two landing points, one near Shangri-La resort. The feasibility study will involve Atoll Councils and the public to minimize impact on reclaimed areas. President Muizzu stated that the contract will ascertain the bridge's cost. The bridge aims to connect all Addu City districts, fulfilling a campaign pledge.

2 locations Unverified optimistic
M

Source

Maldives Republic

Published

Jan 6, 2024

Reading

3 min

Views

0

Minister of Construction and Infrastructure Abdulla Muththalib announced that a contractor will soon be assigned for a technical feasibility study and design of the Addu Bridge, which will connect the interlinked island districts of Addu City and Hulhumeedhoo. The project is part of President Mohamed Muizzu's 'Week 14' roadmap with MVR 30 million budgeted for 2024. The bridge will have two landing points, one near Shangri-La resort. The feasibility study will involve Atoll Councils and the public to minimize impact on reclaimed areas. President Muizzu stated that the contract will ascertain the bridge's cost. The bridge aims to connect all Addu City districts, fulfilling a campaign pledge.

This story involves 1 source and may affect public understanding of infrastructure / study.

Maldives Republic News Outlet Single source

Angle: Primary coverage

Focus: Technical Study for Addu Bridge To Be Assigned Soon: Minister Muththalib

Unique detail: Technical Study for Addu Bridge To Be Assigned Soon: Ministe...

20:15

Initial report published

Maldives Republic

1

Official government or institutional statement

2

Further reporting from additional sources

3

Public and social media reaction

4

Related policy or operational changes

Explore all →
21 nodes 40 edges