Hi, I'm Viyu. Ask me about the stories collected here. I answer only from them, with numbered links to the outlets that published them, and I say so when they do not cover it.
Nasheed Urges Tender Process for Hanimaadhoo Airport Amid Adani Allegations
Former President Mohamed Nasheed called for Hanimaadhoo International Airport's operation to be awarded through an open tender, preferably to a private party, amid allegations by former President Abdulla Yameen that the government plans to hand the airport to India's Adani Group. Economic Minister Mohamed Saeed rejected the allegations, while Construction Minister Abdulla Muththalib said the airport project is 88.7% complete and on track for a September opening.
Sources1carried itMR1 of 19 news outlets we monitor
Figures8as written, with their sentences
One outlet so far Only Maldives Republic has reported this among the sources we monitor. A gap in what we monitor, not proof that others did not report it.
Who said what
the reports' own quoted words, each once
The benefits to the Maldives would be greater if we could earn money by leasing what we have, rather than trying to repay loans through airport operations
Nothing to compare yet. If another monitored source reports it, its headline appears beside this one.
Figures in these reports
as written, with the sentence they come from
88.7%project completionMaldives RepublicAccording to Construction Minister Abdulla Muththalib, the project is 88.7% complete and on track for a September opening.
Word for word from the report in Maldives Republic. Open the report
96%infrastructure completion (air traffic control tower, hangar, cargo building)Maldives RepublicThe runway has been finished, and infrastructure such as the air traffic control tower, hangar, and cargo building is 96% complete.
Word for word from the report in Maldives Republic. Open the report
US$136.6 millionline of credit from India's Exim BankMaldives RepublicFunded through a US$136.6 million line of credit from India's Exim Bank, the development includes a new 2.46-kilometre runway
Word for word from the report in Maldives Republic. Open the report
2.46-kilometrenew runway lengthMaldives Republicthe development includes a new 2.46-kilometre runway capable of accommodating Airbus A320 and Boeing 737 aircraft.
Word for word from the report in Maldives Republic. Open the report
1.3 million passengers annuallypassenger terminal capacityMaldives RepublicThe passenger terminal is expected to handle 1.3 million passengers annually.
Word for word from the report in Maldives Republic. Open the report
MVR 2 billionpublic debt added (hypothetical, if GMR concession continued)Maldives Republicthe new airport would have been operating for a decade without adding MVR 2 billion in public debt.
Word for word from the report in Maldives Republic. Open the report
$271 millioncompensation paid to GMR for cancellationMaldives RepublicIn 2016, the Yameen administration paid $271 million in compensation to GMR for the cancellation.
Word for word from the report in Maldives Republic. Open the report
25-yearGMR concession termMaldives RepublicHe noted that if the 25-year concession to India's GMR Group had continued,
Word for word from the report in Maldives Republic. Open the report