Hi, I'm Viyu. Ask me about the stories collected here. I answer only from them, with numbered links to the outlets that published them, and I say so when they do not cover it.
MACL: Hulhumalé Phase 3 Reclamation Nears Halfway Mark as Dredging Accelerates
MACL reports that the Hulhumalé Phase 3 land reclamation project has reached 31 hectares of a planned 63 hectares, about 49.2 percent completion, with dredging resumed on 10 November 2025 using two 22,000 cubic metre dredgers. The reclaimed land is intended to support future residential, commercial and infrastructure development under the updated Hulhumalé master plan.