Hi, I'm Viyu. Ask me about the stories collected here. I answer only from them, with numbered links to the outlets that published them, and I say so when they do not cover it.
New 588-Slot Parking Area Planned for Boduthakurufaanu Magu
MTCC is building a 588-slot motorcycle parking zone in front of the Bank of Ceylon as part of the ongoing Boduthakurufaanu Magu redevelopment in Malé. The company says the project is nearing completion, with active segments targeted to fully reopen by the end of June.
Nothing to compare yet. If another monitored source reports it, its headline appears beside this one.
Figures in these reports
as written, with the sentence they come from
588 slotsmotorcycle parking slotsThe StandardSpeaking to state media PSM News, MTCC Project Manager Sharuvaz Abdullah said a dedicated parking zone with 588 motorcycle slots is being constructed directly in front of the Bank of Ceylon.
Word for word from the report in The Standard. Open the report
approximately 1,400 square feetparking area sizeThe Standard"A parking zone with 588 slots is being developed in front of the Bank of Ceylon across an area measuring approximately 1,400 square feet," Sharuvaz said.
Word for word from the report in The Standard. Open the report
approximately 838 meterslength of first phase segmentsThe StandardThe first phase of the project covers five segments extending from the Local Market area to the Henveiru Ferry Terminal, spanning approximately 838 meters in total length.
Word for word from the report in The Standard. Open the report
MVR 144 millionproject costThe StandardThe redevelopment project was awarded to MTCC at a cost of MVR 144 million.
Word for word from the report in The Standard. Open the report