Meet Viyu Ask about the news

Hi, I'm Viyu. Ask me about the stories collected here. I answer only from them, with numbered links to the outlets that published them, and I say so when they do not cover it.

Terms & Legal

Today
Sources 3carried it 3 of 19 news outlets we monitor
Reports3one each
Reported over3 hfirst to latest report
Figures11as written, with their sentences

What happened

in order; days are read from the reports' words and dates
  1. Fri 30 Jan
    President Dr Mohamed Muizzu announced the start of reclamation under the current project. 30 January 2026 only MM TV (English) President Dr Mohamed Muizzu announced the start of reclamation under the current project on 30 January 2026.

    Word for word from the report in MM TV (English). Open the report

  2. Wed 4 Nov
    Land reclamation at Giraavaru Falhu resumed after a five-month hiatus and MACL announced the update. 4 Nov only Adhadhu (English) newest The Maldives Airports Company Limited (MACL) announced yesterday that land reclamation at Giraavaru Falhu—a project designated to provide housing for Male’ residents—has resumed after a five-month hiatus

    Word for word from the report in Adhadhu (English). Open the report

Who said what

the reports' own quoted words, each once

How the story developed

reports by day, newest first
  1. Thu 5 Nov3 reports

How the reporting differs

3 sources side by side
Every outlet's headline usesgiraavarufalhureclamation
MM TV (English)News outlet

Giraavaru Falhu gains 115 hectares as reclamation progresses

115 hectares reclaimed land gained at Giraavaru Falhu
Only in this outlet's headlinegainsprogresses

Different words do not mean different facts: the cards above compare headline wording only.

Who reported it, and when

3 outlets, over 3 h
  1. The Standard 5 Nov, 10:00 · first report
  2. Adhadhu (English) 5 Nov, 13:01 · 3 h later
  3. MM TV (English) 5 Nov · time not given
5 Nov, 10:005 Nov, 13:01

Newest report: Adhadhu (English), 5 Nov, 13:01. Reports with a date and no time are listed but not placed on the line.

Claims side by side

figures and events as extracted, each with its sentence

0 agreed0 written differently13 from one source

From one source

Only one source we monitor stated it. That is a gap in what we monitor, not a doubt about it.

  • land reclaimed to date at Giraavaru Falhu to date 115 hectares Adhadhu (English) has resumed after a five-month hiatus, with 115 hectares reclaimed to date.

    Word for word from Adhadhu (English). Open the report

  • share of planned reclamation completed to date 68.8 percent Adhadhu (English) the company stated that "68.8 percent of the planned 167.15 hectares" has now been completed.

    Word for word from Adhadhu (English). Open the report

  • planned total reclamation area project total 167.15 hectares Adhadhu (English) the company stated that "68.8 percent of the planned 167.15 hectares" has now been completed.

    Word for word from Adhadhu (English). Open the report

  • government loan issued to MACL for reclamation costs current year MVR 650.7 million Adhadhu (English) the government issued a MVR 650.7 million loan to MACL to cover the costs of the reclamation.

    Word for word from Adhadhu (English). Open the report

  • reclaimed land gained at Giraavaru Falhu 115 hectares MM TV (English) Giraavaru Falhu has gained 115 hectares of reclaimed land as work advances on a Government project to address housing needs in the Malé region, Maldives Airports Company Limited (MACL) has announced.

    Word for word from MM TV (English). Open the report

  • reclamation progress against plan 68.8 per cent of the planned 167.15 hectares MM TV (English) In its latest update on X, MACL reported that reclamation had reached 68.8 per cent of the planned 167.15 hectares.

    Word for word from MM TV (English). Open the report

and 7 more, in the Evidence tab and the reports.

Figures in these reports

as written, with the sentence they come from
  • 115 hectares reclaimed land gained at Giraavaru Falhu MM TV (English) Giraavaru Falhu has gained 115 hectares of reclaimed land as work advances on a Government project to address housing needs in the Malé region, Maldives Airports Company Limited (MACL) has announced.

    Word for word from the report in MM TV (English). Open the report

  • 68.8 per cent of the planned 167.15 hectares reclamation progress against plan MM TV (English) In its latest update on X, MACL reported that reclamation had reached 68.8 per cent of the planned 167.15 hectares.

    Word for word from the report in MM TV (English). Open the report

  • 167.15 hectares planned reclamation area MM TV (English) In its latest update on X, MACL reported that reclamation had reached 68.8 per cent of the planned 167.15 hectares.

    Word for word from the report in MM TV (English). Open the report

  • 97.15 hectares unfinished reclamation assigned to MACL MM TV (English) the company responsible for reclaiming the 97.15 hectares left unfinished after the previous administration completed 70 hectares.

    Word for word from the report in MM TV (English). Open the report

  • 70 hectares reclamation completed by previous administration MM TV (English) the company responsible for reclaiming the 97.15 hectares left unfinished after the previous administration completed 70 hectares.

    Word for word from the report in MM TV (English). Open the report

  • 22,000 cubic metres capacity of Oranje dredger MM TV (English) The work involves the Queen of the Netherlands and Oranje dredgers, which have capacities of 35,000 and 22,000 cubic metres respectively.

    Word for word from the report in MM TV (English). Open the report

  • 113 hectares additional land to be reclaimed MM TV (English) the current Administration has decided to reclaim an additional 113 hectares as part of the Giraavaru Falhu project to address infrastructure and service requirements.

    Word for word from the report in MM TV (English). Open the report

  • 115 hectares land reclaimed to date at Giraavaru Falhu Adhadhu (English) has resumed after a five-month hiatus, with 115 hectares reclaimed to date.

    Word for word from the report in Adhadhu (English). Open the report

  • 68.8 percent share of planned reclamation completed Adhadhu (English) the company stated that "68.8 percent of the planned 167.15 hectares" has now been completed.

    Word for word from the report in Adhadhu (English). Open the report

  • 167.15 hectares planned total reclamation area Adhadhu (English) the company stated that "68.8 percent of the planned 167.15 hectares" has now been completed.

    Word for word from the report in Adhadhu (English). Open the report

1 more figure
  • MVR 650.7 million government loan issued to MACL for reclamation costs Adhadhu (English) the government issued a MVR 650.7 million loan to MACL to cover the costs of the reclamation.

    Word for word from the report in Adhadhu (English). Open the report

These reports are matched by their headlines, so one may be a different story: check each.

Subjects

sectors and approved topics, alphabetical

Places

alphabetical

Named in these reports

alphabetical

Story so far

other stories on the same subject

After

Matched by the words in headlines, so one may be about something else: check each.