Construction of Malé surfing stadium advancing, says president
President Muizzu said construction of a surfing stadium in Malé is advancing and described it as an important addition to the country's sports infrastructure.
President Muizzu said construction of a surfing stadium in Malé is advancing and described it as an important addition to the country's sports infrastructure.
The project was awarded to a Chinese company, with the agreement signed on 18 April 2024.
Word for word from the report in MM TV (English). Open the report
Demolition of the Bridge View platform began on 25 November 2024 to prepare the site for redevelopment into an international-standard surfing stadium.
Word for word from the report in MM TV (English). Open the report
President Dr Mohamed Muizzu · The National Surfing Stadium will be completed and handed over to the country's surfing community as promised.
Different words do not mean different facts: the cards above compare headline wording only.
0 agreed0 written differently2 from one source
Only one source we monitor stated it. That is a gap in what we monitor, not a doubt about it.
The project was awarded to a Chinese company, with the agreement signed on 18 April 2024.
Word for word from MM TV (English). Open the report
Demolition of the Bridge View platform began on 25 November 2024 to prepare the site for redevelopment into an international-standard surfing stadium.
Word for word from MM TV (English). Open the report
These reports are matched by their headlines, so one may be a different story: check each.