R
RajjeViyu
Sign Up

RajjeViyu Assistant

Ask anything about Maldives news

Featured infrastructure / road redevelopment Boduthakurufaanu Magu Impact 7.0/10 1 min read
President Muizzu Inspects Progress of Boduthakurufaanu Magu Redevelopment Project

President Muizzu Inspects Progress of Boduthakurufaanu Magu Redevelopment Project

President Dr Mohamed Muizzu inspected the ongoing redevelopment of Boduthakurufaanu Magu, a key infrastructure project between Henveiru Ferry Terminal and the Local Market. He visited the northern section near the MMA area with Minister of Construction Dr Abdulla Muththalib and MTCC Managing Director Ahmed Saudee. All sheet piling and installation works are complete, with 82% of land reclamation finished. The project includes dual carriageways, partial sea reclamation, road widening, and underground infrastructure. Announced earlier this year during the inauguration of renovated Izzuddin Jetty, the project was contracted to MTCC on April 9, 2025. President Muizzu pledged the road will be completed and inaugurated by end of year.

President Dr Mohamed Muizzu inspected the ongoing redevelopment of Boduthakurufaanu Magu, a key infrastructure project between Henveiru Ferry Terminal and the Local Market. He visited the northern section near the MMA area with Minister of Construction Dr Abdulla Muththalib and MTCC Managing Director Ahmed Saudee. All sheet piling and installation works are complete, with 82% of land reclamation finished. The project includes dual carriageways, partial sea reclamation, road widening, and underground infrastructure. Announced earlier this year during the inauguration of renovated Izzuddin Jetty, the project was contracted to MTCC on April 9, 2025. President Muizzu pledged the road will be completed and inaugurated by end of year.

2 locations Unverified optimistic
M

Source

Maldives News Network

Published

Sep 17, 2025

Reading

1 min

Views

0

President Dr Mohamed Muizzu inspected the ongoing redevelopment of Boduthakurufaanu Magu, a key infrastructure project between Henveiru Ferry Terminal and the Local Market. He visited the northern section near the MMA area with Minister of Construction Dr Abdulla Muththalib and MTCC Managing Director Ahmed Saudee. All sheet piling and installation works are complete, with 82% of land reclamation finished. The project includes dual carriageways, partial sea reclamation, road widening, and underground infrastructure. Announced earlier this year during the inauguration of renovated Izzuddin Jetty, the project was contracted to MTCC on April 9, 2025. President Muizzu pledged the road will be completed and inaugurated by end of year.

This story involves 1 source and may affect public understanding of infrastructure / road redevelopment.

Maldives News Network News Outlet Single source

Angle: Primary coverage

Focus: President Muizzu Inspects Progress of Boduthakurufaanu Magu Redevelopment Project

Unique detail: President Muizzu Inspects Progress of Boduthakurufaanu Magu ...

06:24

Initial report published

Maldives News Network

1

Official government or institutional statement

2

Further reporting from additional sources

3

Public and social media reaction

4

Related policy or operational changes

Explore all →
12 nodes 23 edges